fortress fence installation
fortress fence installation
1. Fig. 2. Use file to smooth cut edges. 1. 0000003587 00000 n Versai Flat Top Design 5 ft. W x 4.5 ft. H Gloss Black Steel Fence Gate for Pool Application. Fig. 4. 2. 3. 1 2X PANEL INSTALLATION Step 1: Install Level Panel 1. 0000066901 00000 n 2. 4. As shown in Fig. 2. 69 31 Using a Rubber Mallet, gently tap the cap onto to post. 1 Reciprocating Saw Fig. INSTALLATION INSTRUCTIONS VERSAI RESIDENTIAL FENCE FENCING INSTALLATION: VERSAI 1. Swivel Bracket (EXS-104) - This bracket is designed to be utilized for angled panel installation. Pre-drill bracket holes with a 5/32 [4mm] drill bit. Required Tools Goggles Safety Gloves Bit Extender Tape Measurer Socket Set Pliers Drill Wheelbarrow Speed Square Nut Driver Bits: 5/16 [9mm], [13mm] Ground Stakes String Concrete/ Gravel Spade Shovel Level Tool Fortress Touch-up Paint #2 Phillips Head Bit Pencil Drill Bits: 5/16 [8mm], Spring Punch Reciprocating Saw or Portable Bandsaw 5/32 [4mm] Rubber Mallet Post Hole Digger VERSAI FENCE OPTIONS Posts Versai Fence posts are available as 2 [50mm] square, 16 gauge [1. 1 Step 2: Pour Concrete 1. As shown in Fig. 1. As shown in Fig. 0000004128 00000 n 3. 3. 1 Fig. As shown in Fig. This is a bracket that has a fixed position on the post and change of direction is not possible once panel installation begins. 0000067383 00000 n 2. 0000011375 00000 n 3. 3 Bracket Hole Locations: 34 [864mm] Panel Pre-drill Dimensions: Pre-drilling with a 5/32 [4mm] drill bit is required 3 Rail Panel A B FT3, SP3, EXT3 23-3/4 [603mm] 5-1/16 [128mm] FT-FB3, SP-FB3, EXT-FB3 27-3/4 [694mm] 5-1/16 [128mm] 2 Rail Panel A B FT2, SP2, EXT2 28-13/16 [731mm] N/A FT-FB2, SP-FB2, EXT-FB2 32-13/16 [831mm] N/A *Bottom surface of the bottom Rail has a min. 2 13mm Step 2: Install Angled Panel 1. Line Bracket (EXW-204) - Utilizing this bracket is one of the easiest ways of installing the Versai Fence. 10mm Nut Driver or T-25 Bit can be used to install screws. 99 0 obj <>stream Step 2: Pre-Drill and Install Brackets Tip: Its important to double check dimensions to confirm accuracy of bracket hole locations before drilling. If panel was cut to length, a 5/16 [9mm] hole must be drilled in the rail. 0000000916 00000 n As shown in Fig. 2. As shown in Fig. Fig. 2 24 [609mm] Fig. 1 Gravel/ Crushed Stone Fig. 2. Drive Gates are available in 72 [1828mm] width Flat Drive Gates as well as 96 [2438mm] Arched & Flat Drive Gates. 2 Fig. xref DO NOT over tighten screws. The bracket mounts on the inside face of the post. 3. As shown in Fig. Always design your layout to minimize the number of panels that need to be cut. <<20E47FAA56226D4EAFCA0C7534C00FE7>]/Prev 343577>> Use a level to confirm that corner post is plumb and that the post is aligned with the Guide Strings. Identify the property line and determine the perimeter of your fence project. 1 Fig. TABLE OF CONTENTS English 2 Introduction.3 Versai Fence Options4 Fence Layout6 Post Installation10 Bracket Installation11 Panel Cutting INTRODUCTION READ INSTRUCTIONS COMPLETELY BEFORE STARTING INSTALLATION It is the responsibility of the installer to meet all code and safety requirements, and to obtain all required building permits. Xg0'02j4ex`a }7c0H71AA'X'00b8xA)FIxt7.8 GVK1VKP YV 0000066864 00000 n Fig. If layout has 90 corners, confirm that corners form 90 angles. 3. (2 [50mm] Post Max On Center Spacing is 92-3/8 [2346mm]). Unless otherwise noted, all proprietary names are trademarks of Fortress Iron, LP. 1. Fig. Step 2: Install Pressed Dome Cap 1. BRACKET INSTALLATION Bracket Details: *Reference Bracket & Rail Options on page 5. Use low speed setting on drill. 2. 1. Confirm direction of rake before installation. 0000067288 00000 n 0000031158 00000 n 0000017166 00000 n 0000005974 00000 n As shown in Fig. spacing of 2 [50mm] above ground surface. 8 Bracket Hole Locations: 58 [1473mm] Panel Pre-drill Dimensions: Pre-drilling with a 5/32 [4mm] drill bit is required 3 Rail Panel A B FT3, SP3, EXT3 45-3/4 [1162mm] 5-1/16 [128mm] FT-FB3, SP-FB3, EXT-FB3 51-3/4 [1314mm] 5-1/16 [128mm] 2 Rail Panel A B FT2, SP2, EXT2 52-13/16 [1341mm] N/A FT-FB2, SP-FB2, EXT-FB2 56-13/16 [1443mm] N/A *Bottom surface of the bottom Rail has a min. Using a tape measure determine the length of each fence run. All surfaces should be cleaned using a soft cloth or sponge. All rights reserved. The fencing installer should determine and implement appropriate installation techniques for each installation situation. 2. 3. Fill holes with 3 [72mm] of pea gravel or crushed stone to allow for drainage. 4. 0000015152 00000 n Remove or add gravel to set post hole depth at 24 [609mm]. Note: 2 and 3 Rail options are available. spacing of 2 [50mm] above ground surface. 0000001319 00000 n Fig. 4. 0000003735 00000 n As shown in Fig. Hang panel to the inside of mounted brackets. All Versai Fence Panels are rackable to 48 [1219mm]. Fill Posts holes with concrete to within 1 [25mm] of the surface of soil. 1 Fig. FENCE LAYOUT Step 1: Sketch Layout of Fence Perimeter 1. Fig. 1. 0000004683 00000 n Surfaces should be thoroughly rinsed after cleaning to remove all residues. 2 8 [203mm] 27 [685mm] Step 4: Set Posts 1. 2. Make cut marks on posts. 0000067526 00000 n Fig. 0000003622 00000 n Use panel opening length found in step 1 above as cut length. Maximum angle is 30o. 0000026253 00000 n Fortress Building Products and its distributors shall not be held liable for improper or unsafe installations. 1. Use the string as a guide when placing posts in each hole. As shown in Fig. If no gates are used, only one panel should need to be cut. Attach bracket to the posts with supplied Hex Head Self-drilling screws. Tip: Measure from the back wall of the bracket to the back wall of the bracket on other post. Fig. Confirm that the length between each top, middle & bottom brackets are equal. As shown in Fig. 0000013263 00000 n Using the fence layout sketch as a guide, locate a corner or reference point along each fence run and mark it with a stake. Fig. trailer 1 Install Panel Into higher Post First Rake Panel Down Slope POST CUTTING & PRESSED DOME CAP INSTALLATION Step 1: Trim Excess Post Material 1. Post should extend 2 [50mm] above highest picket or rail. 3. H\j@F}l.liM F'1yWZz9NoC75NGwB_bn.$]3ws$}RU. 2. 2. Use a string stretched between stakes located at the end of each fence run, and layout the perimeter of the fence project. 0000021094 00000 n 0000007805 00000 n Secure top, middle & bottom rail of panel using screw & bolt. startxref 1. 2. Versai Fence is easiest to install when starting from a corner. 0000002480 00000 n Step 3: Cut & Clean Panels 1. endstream endobj 70 0 obj <>>> endobj 71 0 obj >/PageWidthList<0 612.0>>>>>>/Resources<>/ExtGState<>/Font<>/ProcSet[/PDF/Text/ImageB]/Properties<>/Shading<>/XObject<>>>/Rotate 0/TrimBox[0.0 0.0 612.0 792.0]/Type/Page>> endobj 72 0 obj <> endobj 73 0 obj <> endobj 74 0 obj [/ICCBased 89 0 R] endobj 75 0 obj <> endobj 76 0 obj <> endobj 77 0 obj <>stream 0 3. Confirm post hole depth. Versai Fence posts are designed to be buried 24 [609mm] deep. hb`````f`e`Pfd@ As=>\``: \K'WIO&I2Oqtc=e0agR_lM'bHB[\I)k,]duT6XIIIj GXQP*((SB@Zj?70x Fig. 0000019240 00000 n 2. As shown in Fig. 3. Tip: Have a second person hold down far end of panel to stop movement when cutting. As shown in Fig. 0000005311 00000 n Fig. 3. Layout fence so that minimal panel cuts are required; remember to allow for gates. FortressBP.com | 866.323.4766 2020 Fortress Building Products. Use Spring Punch to mark the holes. Remove any metal shavings and dust with a brush or rag. Fig. %PDF-1.5 % 0000023743 00000 n As shown in Fig. 3 Step 4: Apply Spray Paint To Cut Areas 1. 2 Do not measure from post Measure from back of bracket Measure the panel opening Step 2: Mark Panel with Cut Points 1. Pressed Dome Caps & Ball Caps are press fit into place. Tip: Have a second person supporting opposite end of panel. As shown in Fig. Over tightening can result in damage to the rail. }f{%Kl5vn>6Kwaenr,S=vmm:2Myu8jRe6VzJ4cRe17b>}sr^\qBn[[B7M&%A ))w;0"S)GxyVgD9\uSK. %%EOF 5 Bracket Hole Locations: 46 [1168mm] Panel Pre-drill Dimensions: Pre-drilling with a 5/32 [4mm] drill bit is required 3 Rail Panel FT3, SP3, EXT3 FT-FB3, SP-FB3, EXT-FB3 A B 33-3/4 [857mm] 5-1/16 [128mm] 39-3/4 [1009mm] 5-1/16 [128mm] 2 Rail Panel FT2, SP2, EXT2 FT-FB2, SP-FB2, EXT-FB2 A B 40-13/16 [1036mm] N/A 44-13/16 [1138mm] N/A *Bottom surface of the bottom Rail has a min. When installing this bracket,the brackets must be slid over the top of the post prior to installing any panels, in the direction they will be installed. 2. Secure top, middle & bottom rail of panel using screw bolt. For installation of this bracket, the set up laid out for the EXW-204 Bracket can be utilized in the same manner by attached the panel to the bracket initially, then installing the Self-Tapping Screw at the end of the process. CARE & MAINTENANCE Care And Maintenance Of Fortress Building Products Powder-Coated Products And Surfaces: Immediately after installation of your Fortress Building Products, clean powder-coated products and surfaces with a solution of warm water and non-abrasive, pH neutral detergent solution. Fig. Slide panel to the inside of mounted brackets. End Bracket (EX-104) - This bracket can be used in all applications for Versai Fence. 3. Fig. Panel & Gate Styles All Versai Fence Panels have matching Flat & Arched Walk Gates in widths of 46-1/2 [1181mm] & 58-1/2 [1485mm]. Use tape measure to check depth. 69 0 obj <> endobj 1. Center the Pressed Dome Cap on the post. 2. JOIN THE REVOLUTION. 0000000016 00000 n 0000001446 00000 n Compact the gravel before setting post. DO NOT over tighten the nut when attaching the panel to the bracket. Tip: Allow concrete to cure for a minimum of 24 hours before installing brackets. 3. As shown in Fig. 0000069424 00000 n The bracket mounts on the inside face of the post. Step 2: Use Stakes & String to Create Perimeter 1. POST INSTALLATION Step 1: Install Post 1. Cut Panels using a Reciprocating Saw. Position post along guide string. 0000002963 00000 n 4. spacing of 2 [50mm] above ground surface. Determine required post height. Make sure surfaces to be painted are clean. 0000009542 00000 n 0000004595 00000 n
Hanging Straps Home Depot, Best Mavic Air 2 Accessories, 2007 Buick Lucerne Motor Mount Replacement, Best Scuba Diving Playa Del Carmen, Velvet Swivel Chair With Ottoman, Fendi Earrings Silver,
Posted by on Thursday, July 22nd, 2021 @ 5:42AM
Categories: is blackjack jewelry legit